Skip to content
  • Home
  • About Us
    • Regional Planning Governing Board
    • Regional Planning Commission
  • Projects & Resources
    • Truckee Meadows Regional Plan
    • Natural Resources Plan
      • Data Portal
    • Truckee Meadows Annual Report
    • Washoe County Consensus Forecast
    • Affordable Housing
    • Public Infrastructure Plan
      • PIP Dashboard
    • Truckee Meadows Trails
    • Energy and Data Centers
    • Planner Portal
  • Maps & GIS Data
  • Meetings
    • RPGB Meetings
    • RPC Meetings
  • Connect
    • Careers & Opportunities
    • Events & Schedule
    • Past Events
  • Home
  • About Us
    • Regional Planning Governing Board
    • Regional Planning Commission
  • Projects & Resources
    • Truckee Meadows Regional Plan
    • Natural Resources Plan
      • Data Portal
    • Truckee Meadows Annual Report
    • Washoe County Consensus Forecast
    • Affordable Housing
    • Public Infrastructure Plan
      • PIP Dashboard
    • Truckee Meadows Trails
    • Energy and Data Centers
    • Planner Portal
  • Maps & GIS Data
  • Meetings
    • RPGB Meetings
    • RPC Meetings
  • Connect
    • Careers & Opportunities
    • Events & Schedule
    • Past Events
Search

Data Type: Document

Evaluation of Groundwater and Solute Transport in the Fernley – Wadsworth Area

A hydrogeologic investigation was undertaken to characterize the groundwater system in the Fernley Basin and to determine the TDS loading to the Truckee River between the towns of Wadsworth and […]

Reach Y Restoration Feasibility Assessment 1 Final Draft

This report examines opportunities for restoring geomorphic and ecosystem function of the Truckee River between East McCarran Blvd. and near the Truckee Meadows Water Reclamation Facility (TMWRF), herein referred to […]

Load Duration Curve Methodology for Assessment and TMDL Development Nevada Division of Environmental Protection

This paper discusses the steps taken to develop load duration curves and how they can be used in the assessment and TMDL process.

Reach Y Restoration Feasibility Assessment 2 Final Draft

This report examines opportunities for restoring geomorphic and ecosystem function of the Truckee River between East McCarran Blvd. and near the Truckee Meadows Water Reclamation Facility (TMWRF), herein referred to […]

Memo Data availability for modeling water quality on the Truckee River

This document provides a description of data available to support water quality modeling in the Truckee River Basin (DSAMMt model). Conditions within the Truckee Basin have changed considerably throughout the […]

Reach Y Restoration Feasibility Assessment 3 Final Draft

This report examines opportunities for restoring geomorphic and ecosystem function of the Truckee River between East McCarran Blvd. and near the Truckee Meadows Water Reclamation Facility (TMWRF), herein referred to […]

Nevada State Question 1 Truckee River Funding Project Book

State Question 1, approved by Nevada voters in Noveber 2002, calls for $200,000,000 in funding in support of clean water, parks, and wildlife across the state.

Placer County and Town of Truckee 2013 Joint Annual Monitoring Report for the Truckee River Water Quality Monitoring Program

This report presents the results of implementing the fourth year of the Truckee River Water Quality Monitoring Plan (TRWQMP) which took place during the 2013 water year (October 1, 2012 […]

Placer County and Town of Truckee Final Joint Annual Monitoring Report for the Implementation of the Truckee River Monitoring Plan, Water Year 2011

This Joint Annual Monitoring Report describes the monitoring activities performed by Placer County and the Town of Truckee during WY 2011 and presents their results.

Placer County Final Annual Report for the Implementation of the Truckee River Water Quality Monitoring Plan, Water Year 2010

This report presents the first year results for the Placer County, CA (County) portion of the Truckee River Water Quality Monitoring Plan (TRWQMP).

← Previous
Next →
Facebook Instagram Twitter Youtube Linkedin
  • 775-321-8385
  • input@tmrpa.org

Our offices are located on the 3rd floor of the Regional Transportation Commission building at 1105 Terminal Way. 

Copyright © 2022 Truckee Meadows Regional Planning Agency. All Rights Reserved.